Salsbury Industries 4375 Mail Package Drops In-Ground Mounted Pedestal User Manual

Mail package drops – 4375

Advertising
background image

SALSBURY INDUSTRIES

1010 East 62

nd

Street, Los Angeles, CA 90001-1598

Phone: 1-800-624-5269 Int’l Phone: 323-846-6700

Fax: 1-800-624-5299 Int’l Fax: 323-846-6800

www.mailboxes.com engineering

@

mailboxes.com

Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.

Copyright © 2011 Salsbury Industries. All rights reserved. (Rev. 02, 12/15/11)

Mail Package Drops – 4375

In-Ground Mounted Pedestal Installation Instructions

U.S.P.S. APPROVED





Installing the In-Ground Mounted Pedestal


When you install a curbside or roadside mailbox, make sure that it is

easily accessible to the mail carrier. By regulation a locked mailbox

should be 41” to 45” from the ground or street surface up to the point

of mail entry. The door should be set back 6” to 8” back from the
front face of the curb or the road edge. However, you should check

with your local postmaster to ensure that the mailbox is installed

according to local regulations. It is important to note that it is not the

responsibility of mail carriers to open mailboxes that are locked,
accept keys for this purpose, or lock mailboxes after delivery of the

mail.

To install the in-ground mounted pedestal, begin by digging a hole for
the concrete footing and then prepare the concrete. The top surface

of the footing should be about 12” by 18”. See the illustration for the

relative position of the rectangular footing to the pedestal or post and

mail package drop. The concrete should extend into the ground 24”
or greater if your local frost line is deeper. Installing the concrete

below the frost line will prevent movement during ground freezing

and thawing. The bottom of the hole for the concrete footing should

be filled with a depth of about 6” of gravel to promote drainage under
the post. The top of the footing should be sloped for water runoff.

When digging the hole for the footing, be careful to not puncture

water, sewer, or gas lines.

After digging the hole, set the pedestal in the hole and fill the hole

with the prepared concrete mix. Prod the mix with a stick while filling

to reduce any air pockets. If you want to conceal the concrete, pour

it to within a few inches of the top of the hole and cover with soil after
the concrete has set. Use a carpenter’s level on the sides of the post

to ensure that the post is aligned vertically. Periodically check the

vertical alignment of the post as the concrete is curing.