Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.

Copyright © 2011 Salsbury Industries. All rights reserved. (Rev. 03, 11/1/11)

Deluxe Rural Mailboxes – 4850D

Bolt Mounted Mailbox Post Installation Instructions

U.S.P.S. APPROVED







Installing the Bolt Mounted Mailbox Post

When you install a curbside or rural mailbox, make sure that it is

easily accessible to the mail carrier. By regulation it should be 41” to
45” from the ground or street surface up to the inside floor of the

mailbox. The door should be set back 6” to 8” back from the front

face of the curb or the road edge. However, you should check with

your local postmaster to ensure that the mailbox is installed
according to local regulations.

To install the bolt mounted mailbox post, begin by digging a hole for

the concrete footing and then prepare the concrete. The top surface

of the footing should be about 12” by 18”. See the illustration for the
relative position of the rectangular footing to the post and mailbox.

The concrete should extend into the ground 24” or greater if your

local frost line is deeper. Installing the concrete below the frost line

will prevent movement during ground freezing and thawing. The

bottom of the hole for the concrete footing should be filled with a
depth of about 6” of gravel to promote drainage under the post. The

top of the footing should be sloped for water runoff.

When digging the hole for the footing, be careful to not puncture
water, sewer, or gas lines.

Hardware for attaching the pedestal to the concrete footing is not

included. J-bolts are shown in the illustration as an example. The

concrete footing should include reinforcing steel and four (4) 1/2”
anchor studs protruding at least 1” above the concrete surface.

Place the anchor studs in a 4” x 10” pattern in the concrete to align

with the holes in the pedestal base.

When the concrete has cured sufficiently, install four (4) leveling nuts
on the anchor studs. Set the pedestal on the leveling nuts with the

four (4) anchor studs protruding through the holes in the pedestal

base plate. Adjust the leveling nuts to square up the pedestal.

Install four (4) nuts and washers on the anchor studs and tighten
securely.











CONCRETE

ANCHORS

NOT

INCLUDED