SATEC PM130 PLUS Quick Start User Manual

Page 4

Advertising
background image

PM130 PLUS QuickStart

www.satec-global.com

CONFIGURATION

The essential configuration includes:

1. Basic measurement setup
2. Communication setup and testing
3. Resetting the min/max, energy, demands etc.

Additional recommended configuration: set points, TOU and data logging
Note: It may be easier first to configure communication and use PAS software for setup

Basic Measurement Setup

In any display screen, press SELECT x 3 (until 

 blinks), then press ENTER

(



blinks),

then

 x 2

()

and ENTER to enter the Basic Settings Display.

Parameter

Description

Default

 (see below) 

Network wiring configuration





Transformation ratio of the Potential Transformers



.

Additional PT factor for EHV network





The Primary Rating Of The Current Transformers

(quick access to this parameter: press SELECT, then simultaneous

and SELECT)



. (E & EH models)

Duration in minutes of the power demand period calculations
E = External pulse in DI1



. (E & EH models)

The number of blocks to be averaged for sliding window demands



.

Duration in seconds for voltage and current demand





The nominal frequency





Max. Demand Load Current in Amperes. 0 = CT primary current.



Wiring Mode

Setup

3-wire 2-element Delta direct connection using 2 CTs



4-wire 3-element Wye direct connection or 3PTs, and 3 CTs

 or 

*

3-wire 2-element Open Delta connection using 2 PTs, 2 CTs



4-wire 2½-element Wye connection using 2 PTs, 3 CTs

 or 

*

3-wire 2½-element Open Delta connection using 2 PTs, 3 CTs



4-wire 3-element Delta direct connection using 3 CTs

 or 

*

3-wire 2½-element Broken Delta connection using 2 PTs, 3 CTs

 or 

*

* LN or LL denotes the default use of L-L or L-N voltages (in thresholds, min/max, demands etc.)

Communication setup and testing

In any display screen, press SELECT x 3

(

 blinks), then press ENTER

(

blinks),

then 

x 3

(

.

) and

ENTER to setup the built in RS-485 port (COM1).

If communication module is present, configure also COM2.

Resetting the min/max, energy, demands etc.

In any display screen, press SELECT x 3 (

 blinks), then press ENTER

(

blinks), then

ENTER to enter the reset menu. Select the value to be reset, press SELECT

to select, then press

ENTER for 5 seconds until the  notification is changed to .


For a Chance to Win a Tablet Register Your Product Here:
www.satec-global.com/register

WIN!

Copyright © 2013 SATEC Ltd.

Advertising