Warning – Schwank STSp-WP2 User Manual

Page 6

Advertising
background image

Page 6

STSp-WP1/2 Supplement

RD: NOV, 2003

RL:2

KH

Installation of the turbulator is imperative to the warranty of
the tubes. Install the turbulator in the last section of tubes.
If installed in the first section of tube, it will cause tubes to
burn out. This will void the warranty. See typical arrange-
ments for turbulator requirements and placement.

WARNING

MODEL

TURBULATOR

LENGTH

(IF REQUIRED)

STSp-WP 200-70/60/50

10’

STSp-WP 175-70/60/50

10’

STSp-WP 155-60

not required

STSp-WP 155-50

not required

STSp-WP 155-40

10'

STSp-WP 130-50

not required

STSp-WP 130-40

10'

STSp-WP 130-30

14'

STSp-WP 110-50

not required

MODEL

TURBULATOR LENGTH

(IF REQUIRED)

STSp-WP 110-40

10'

STSp-WP 110-30

14'

STSp-WP 80-40

10’

STSp-WP 80-30

14'

STSp-WP 80-20

14'

STSp-WP 60-30

14’

STSp-WP 60-20

14'

Where required the STSp-WP Series Heaters will be supplied with the turbulators, factory
installed into the end tube(s) of the system configuration.

Advertising
This manual is related to the following products: