Arena control panel - tube heaters – Schwank Control Panel - Arena User Manual

Page 6

Advertising
background image

ARENA CONTROL PANEL - TUBE HEATERS

K

L

M

N

Power supply: Provide disconnect means and overload protection as required.
System Transformer: 8VA required for each External Relay; 150VA transformer recommended

Use optional

24V/120V Relay Switch (120VAC, 24V Coil, 50/60 Hz, 12 Amps Full

Load) to power up tube heaters

-

Size Heater Circuit(s) (120V, 60 Hz) for 145VA per tube heater.

JS-0568-CC

one relay switch required for each panel switch / zone

- maximum two tube heaters per each panel switch / relay switch

Notes:

L1 (120V)

L2

24V

120V

TIMER

Panel

Reset Switch

G

External System
Transformer 150VA

No Connection

Yellow

Red/Yellow

Brown

Purple

Red

Red

Black

Black

White

Rear View
Control Center

Blue

Black

R

C

W

G

Y

Front View
Control Center
(Transformer)

Blue

Black

24V Field
Wiring

L1

120V

L2

Neutral

Heater Circuit

To Control
Center Relay

From Control

Center Transformer

Panel Toggle

Switch 1

24V

24V

24V

Panel Toggle

Switch 2

Panel Toggle

Switch 16

Panel

ACPT-8

ACPT-12

ACPT-16

Zones

up to 8

up to12

up to 16

14 AWG

12 AWG

10 AWG

24V Circuit Wiring

Panel to Zone Relay

up to100 ft

up to 200 ft

up to 300 ft

System

Transf’m’r

40 VA

100 VA

150 VA

200 VA

250 VA

350 VA

Zones

up to 2

up to 5

up to 7

up to 10

up to 12

up to 16

Line Voltage (120V)

Low Voltage (24V)

Field Wiring

H1

H2

3

1

4

2

Up to

H1

H2

3

1

4

2

Up to

H1

H2

3

1

4

2

Relay

Up to

Control Center
is included with
the Arena Panel

H

N

24V

R

External Relay
(Field Supplied)

A

A

A

1

A

1

24V

R

External Relay
(Field Supplied)

X

X

X

1

X

1

24V

R

External Relay
(Field Supplied)

(Field Supplied)

B

B

B

1

B

1

Advertising