SDC Z7800 SERIES MORTISE LOCK User Manual

Security door controls

Advertising
background image

INSTALLATION INSTRUCTIONS

Z7800 SERIES MORTISE LOCK

SECURITY DOOR CONTROLS

3580 Willow Lane, Westlake Village, CA 91361-4921 • (805) 494-0622 • Fax: (805) 494-8861
www.sdcsecurity.com • E-mail: [email protected]

P:\INSTALLATION INST\Electrified Lockset\INST-Z7800 03/05 Page 1

Any suggestions or comments to this instruction or

product are welcome. Please contact us through

our website or email [email protected]

1. Measure desired height from finished floor, mark a horizontal line on door and door edge.

2. Align template on edge of door with applicable horizontal at height line. Check the chart for drilling trim
holes on template and mark only holes for lock function being installed.

3. Mortise door edge according to measurements on installation template and drill proper holes for trim.

4. Recess for face plate, the dimension is: L 8-1/32" x W 1-5/16" x D 7/32".

A. Door Preparation:

of cylinder

of lockcase

of lever

or knob

Vertical centerline

C

Installation

template

C

L

C

L

C

L

L of

door edge

Height line

of lever

or knob

CL

7/32"

Scan Me for

Product Video

Datasheet

Price List

CAD / Template

Use QR Code Phone App

Advertising