SDC Z7835 SERIES MORTISE LOCK User Manual
SDC For Home
Any suggestions or comments to this instruction or
product are welcome. Please contact us through
our website or email [email protected]
A. Door Preparation:
1. Measure desired height from finished floor, mark a horizontal line on door and door edge.
2. Align template on edge of door with applicable horizontal at height line. Check the chart for drilling trim
holes on template and mark only holes for lock function being installed.
3. Mortise door edge according to measurements on
installation template and drill proper holes for trim.
4. Recess for face plate, the dimension is:
L 8-1/32" x W 1-5/16" x D 7/32".
Height line
of lever
or knob
C
L
7/32"
INSTALLATION INSTRUCTIONS
12VDC Z7835 SERIES MORTISE LOCK
of cylinder
of lockcase
of lever
or knob
Vertical centerline
C
Installation
template
C
L
C
L
C
L
L of
door edge
OPTIONAL
DOOR CORE DRILLING GUIDE
#7000-DG
P:\INSTALLATION INST\Electrified Lockset\INST-Z7835 (12VDC) REV A 05-13 Page 1
801 Avenida Acaso, Camarillo, Ca. 93041 • (805) 494-0622 • Fax: (805) 494-8861
www.sdcsecurity.com • E-mail: [email protected]