Stainless Works Dodge Charger / Magnum 2005-13 Headers User Manual

Page 2

Advertising
background image


13. Re-install radiator overflow and power steering reservoir.

14. Re-install air box assembly.

15. Re-install top engine cover.

16. Re-install oil filter and large plastic cover.

17. Install a 2-½ clamp on both header collectors and install both catalytic converters

on collectors and tighten.

18. Install a 2-½ clamp on both cats and install both right and left lead pipe, rotate

into position and tighten.

19. Remove original O2 sensors from factory manifolds and exhaust and reinstall in

new headers and exhaust. (Be sure to install them exactly how they were
removed, front to rear and left to right)

20. Reconnect battery.

21. Be sure to have adequate clearance around all wires, hoses and lines. If anything

is in contact with the exhaust system, it will melt. Make sure to have at least
½” of clearance and wrap any suspect areas with DEI thermal barrier wrap.

22. After double-checking for clearance and making sure all lines, wires and hoses

are secured, drive the car for 10-20 miles and re-check all clamps and clearances.














WWW.STAINLESSWORKS.NET

800-878-3635

FAX: 440-543-9183

Advertising