Titus Horizontal High Output IOM User Manual

Hhc, hhe, hhp

Advertising
background image

HORIZONTAL HIGH OUTPUT

HH-IOM-00 01-19-09

INSTALLATION AND

MAINTENANCE INSTRUCTIONS

6

f

o

1

e

g

a

P

HHC, HHE, HHP

INSTALLER MUST BE A TRAINED, EXPERIENCED SERVICE

TECHNICIAN

1.

PRESSURE CHECK

The complete unit including coil, valve package and associated piping is shipped

pressurized. Use the air valve to release the pressure. Should there be no pressure,

inspect the unit for possible shipping damage. The unit must be pressure tested again

prior to installation.

2.

MOUNTING

Each unit has four (4) mounting holes. Rubber grommets are supplied with each unit.

Due to the various installation conditions, the mounting bolts/rods, steel washers and

nuts are field supplied.

Level the unit to ensure proper condensate drainage.

3.

PIPING

3.1

All piping leading to the unit must be adequately supported to prevent excessive stress

on the unit’s piping. However, sufficient free movement is required for thermal

expansion/contraction.

3.2

Do NOT over-tighten threaded connections.

3.3

Do NOT overheat sweat connection. Use solder (95/5) with a melting temperature

below 600

o

F.

3.4

When the valve package is supplied separately for field installation, carefully follow

the schematic piping diagram and installation instructions provided with the package.

3.5

All pipes and fittings that extend beyond the drain pan MUST be insulated.

Advertising