INSTALLATION INSTRUCTIONS:

Vertical Basic Fan Coil Series

VBC, VBF, VBA, VBL


INSTALLER MUST BE A TRAINED, EXPERIENCED SERVICE

TECHNICIAN

1.

PRESSURE CHECK


The complete unit including coil, valve package and associated piping is shipped
pressurized. Use the air valve to release the pressure. Should there be no pressure,
inspect the unit for possible shipping damage. The unit must be pressure tested again
prior to installation.


2.

MOUNTING


2.1

The unit is to be located on a leveled surface at the designated location against a wall
or a solid partition. When leveling legs (optional) are supplied, these are located
under the unit’s legs (2 per leg). Turn the bolts as required until the unit is perfectly
level to ensure proper condensate drainage.


2.2

Once leveled and connected, the unit should be bolted to the back wall in such a
manner that will prevent tip-over. Exception: Due to its wider base, the VBC does not
have to be bolted to the back wall.


3.

PIPING


3.1

All piping leading to the unit must be adequately supported to prevent excessive stress
on the unit’s piping. However, sufficient free movement is required for thermal
expansion/contraction.


3.2

Do NOT over-tighten threaded connections.


3.3

Do NOT overheat sweat connection. Use solder (95/5) with a melting temperature
below 600

o

F.


3.4

When the valve package is supplied separately for field installation, carefully follow
the schematic piping diagram and installation instructions provided with the package.