Titus Vertical Stack IOM User Manual

Vsr, vsrm, vsrs, vsm/vss

Advertising
background image

VERTICAL STACK

VS-IOM-00 01-19-09

INSTALLATION AND

MAINTENANCE INSTRUCTIONS

6

f

o

1

e

g

a

P

VSR, VSRM, VSRS, VSM/VSS

INSTALLER MUST BE A TRAINED, EXPERIENCED TECHNICIAN

1.

INSTALLATION

1.1

BEFORE DRYWALL INSTALLATION:

1.1.1 Position unit to align risers with holes in floor. Lower into position. Should the units be

supplied with extensions, weld them to the top of the risers. Extensions for unit on

floor 1 is to be welded to the bottom of risers of the unit on floor 2. Follow this procedure

all the way up in each line.

1.1.2 Level the unit to ensure proper condensate drainage.

1.1.3 If necessary, anchor the unit to the floor through the bottom panel.

1.1.4 Pressure test the complete system.

1.1.5 Make all electrical connections (except for thermostats) inside the internal electric

junction box in accordance with the wiring diagram located on the blower housing. All

electrical work must be made in accordance with The National Electric Code, state and

local codes, bylaws, ordinances or the authority having jurisdiction.

1.2 APPLY DRYWALL to unit as required. Care must be taken not to penetrate any part of

the electrical or drain systems with the drywall screws. Do not allow drywall dust to enter

the unit. This can damage components, such as the motor, shorten component life and

reduce unit efficiency.

Advertising