Titus VHC IOM User Manual

Titus Equipment

Advertising
background image

VERTICAL HIGH OUTPUT

VHC-IOM-00 01-19-09

INSTALLATION AND

MAINTENANCE INSTRUCTIONS

5

f

o

1

e

g

a

P

VHC

INSTALLER MUST BE A TRAINED, EXPERIENCED SERVICE

TECHNICIAN

1.

PRESSURE CHECK

When the valve package is factory installed, the unit is shipped with the coil and

associated piping/valve package pressurized. Use the air valve to release the pressure.

Should there be no pressure, inspect the unit for possible shipping damage. The unit

must be pressure tested again prior to installation.

2.

MOUNTING

This unit is free standing. It MUST be leveled when installed. When leveling legs

are supplied (optional), these are located under the unit’s bottom panel. Turn the bolts

as required until the unit is perfectly leveled to ensure proper condensate drainage.

3.

PIPING

3.1

All piping leading to the unit must be adequately supported to prevent excessive stress

on the unit’s piping. However, sufficient free movement is required for thermal

expansion/contraction.

3.2

Threaded connections must not be over tightened.

3.3

Sweat connections must not be overheated. Use solder (95/5) with a melting

temperature below 600

o

F.

3.4

When the valve package is supplied separately for field installation, carefully follow

the schematic piping diagram and installation instructions provided with the package.

3.5

The inlet (supply), outlet (return) and condensate (drain) points are clearly marked on

the unit’s piping. Depending upon the filed piping layout, the connecting inlet, outlet

and condensate piping could be at the right or left side of the unit. Follow the

Engineer’s pipe layout drawing while routing the supply, return and drain lines to and

from the unit.

3.6

All pipes and fittings outside the unit’s enclosure must be properly insulated as no

external condensate pan is provided with the standard unit.

Advertising