TruXedo Chevrolet Composite Box User Manual

Truxedo, inc, Truxedo, Lo pro chevy composite box instructions

Advertising
background image

STEP 1: Locate side rail as shown in Owner’s Manual. Mark hole

locations on inside of composite box, using pre-punched

mounting slots as guides. Repeat for other side rail.

STEP 2: Drill 9/32” holes at marked locations.

P/N 1115436 Rev. B

To install TruXedo

®

Lo-Pro side rails on your composite box, follow these instructions. Cap screws, flat washers, and lock nuts replace

standard clamp assemblies in your TruXedo

®

Lo-Pro kit. Read all instructions before installing.

STEP 3: Fasten side rails to inside of composite box with 1/4” x

1 1/2” cap screws, washers and lock nuts. Install cap

screws through stake pockets.

mounting

slot

mark

location

&

drill

9/32”

hole

1/4”

x

1 1/2”

cap

screw

side

rail

1/4”

flat

washer

1/4”

nylon

lock

nut

Note: Refer to thetruXedo

®

Lo Pro manual for

complete assembly instructions.

equipment Required

• Power drill with 9/32 bit

• 7/16” Wrench

• Pencil or Chalk

1/4”

x

1 1/2”

cap

screw

side

rail

1/4”

flat

washer

1/4”

nylon

lock

nut

tRuXedo

®

Lo Pro Chevy ComPosite Box instruCtions

stake

pocket

stake

pocket

pre

-

punched

mounting

slot

rear view

pickup

top

rail

flush

t

ru

x

edo

®

l

o

p

ro

side

rails

Note: truXedo

®

Lo-Pro composite box side rails

have two (2) pre-punched mounting slots.

TruXedo, inc.

P.o. Box 1078, 2209 Kellen Gross Dr., yankton, south Dakota 57078

Call toll Free: 1-877-truxeDo (1-877-878-9336) Fax: (605) 664-9304 visit us online: http://www.truxedo.com

Advertising