Installation, Canopies – USG Translucents Canopies User Manual

Page 10

Advertising
background image

9 T

ranslucenTs

Canopies

Installation

Figure 3

Figure 4

Install each structure attachment
plate. Use appropriate anchors and
for the mounting surface and follow
the manufactures guidelines, each
hanging point should have a hold a
design load of 125 lbs with a safety
factor of 2:1.

Using an 8mm Allen Wrench, loosen
the setscrew and insert the wire cable
into the structure attachment clip.

To determine the height of your hanger
cables: (in horizontal install only)
– For a

Valley

installation, trim both

cables 4-3/89 above the finished
ceiling height.

– For a

Vault

installation, trim both

cables 8-3/49 above the finished
ceiling height.

– For a

Wave

installation, trim the

low cable 29 above your finished
ceilings height, and trim your high
cable 14-3/49 above your finished
ceiling.

Canopies

Figure 5

Figure 6

Unscrew the cap from the panel
attachment clip. Unscrew the
Allen screw and attach it to the
cut end of all four wires.

With two people, lift the panel into
position, line up the panel holes with
the panel attachment clips. Screw
attach by hand the cap to the other
half of the panel clip.