humIDItY cOntrOl OPtIOn

Note: This function is not available if controller is

configured for heat pump.

The standard air conditioning system can be adapted

to perform dehumidification control by addition of
a simple humidity controller that closes-on-rise, and
is connected to terminals H1 and H2 on the main
controller board. Recommended Bard Part #8403-038
(H600A 1014). Both HVAC units must be equipped
with electric heat for this sequence to work properly.
See appropriate connection diagram - Figures 1 - 12 for
this connection:

1. Temperature control always has priority over

dehumidification. If there is any stage of cooling

demand active, the dehumidification sequence is
locked

out.

2. If all stages of cooling are satisfied, and relative
humidity is above the set point of humidity

controller:

a. The green “Dehumid. Operation” light will come
on,

and

the

lag unit compressor and blower will

operate until the set point of humidity controller

is satisfied (or cancelled by a call for cooling).
b. If the space temperature drops to 67F, the electric
heater

of

the

lead unit will cycle to help maintain

building temperature. It will cycle off at 69F.

c. If space temperature drops to 64F, the Stage 2

Heating light will come on and the lag unit

compressor operating for dehumidification mode

will cycle off until the building temperature rises

above 65F from 1st stage heat and building load.

The green “Dehumid. Operation” light stays on

during this sequence, and when Stage 2 Heating

light is Off, the compressor is On. The electric

heater in lag unit is locked out in

dehumidification mode.

Lag unit outputs G, Y1 and Y2 are all switched on

during dehumidification sequence. This is true for both

alternating and non-alternating controller configurations.

cOOlInG OPeratInG seQuences FOr

alternatInG leaD/laG/leaD/laG

cOnFIGuratIOn

1. 1-Stage Compressor Units No Economizer

1

st

stage cooling set point is the setting (SP) input

into the controller. Factory default is 77F (25C).
On a call for cooling the blower of the lead unit
will come on immediately (if not already on – See

Blower Operation), and the Stage 1 LED will blink
for 10-seconds before going solid, at which time the
compressor will start.

2

nd

cooling set point is 4F (default setting, user

selectable 2-6F) warmer than Stage 1. On a call for 2

nd

Stage cooling the blower of the lag unit is turned on (if
not already on – See Blower Operation), and the Stage

2 LED will blink for 10-seconds before going solid, at
which time the compressor will start.

3

rd

and 4

th

stages are functional outputs but there is

nothing to be controlled.

2. 2-Stage Compressor Units No Economizer

1

st

stage cooling set point is the setting (SP) input into

the controller. Factory default is 77F (25C). On a call
for cooling the blower of the lead unit will come on
immediately (if not already on – See Blower Operation),

and the Stage 1 LED will blink for 10-seconds before
going solid, at which time the lead unit compressor will
start in compressor Stage 1 partial capacity operation.

2

nd

cooling set point is 4F (default setting, user selectable

2-6F) warmer than Stage 1. On a call for 2

nd

Stage

cooling the blower of the lag unit is turned on (if not

already on – See Blower Operation), and the Stage 2 LED
will blink for 10-seconds before going solid, at which
time the lag unit compressor will start in compressor
Stage 1 partial capacity operation.

3

rd

cooling set point is 2F (default setting, user selectable

2-3F) warmer than Stage 2. On a call for 3

rd

Stage

cooling the Stage 3 LED comes on solid (no delay), and
the lead unit compressor will switch to compressor Stage
2 full capacity operation.

4

th

cooling set point is 2F (default setting, user selectable

2-3F) warmer than Stage 3. On a call for 4th Stage

cooling the Stage 4 LED comes on solid (no delay), and
the lag unit compressor will switch to compressor Stage 2
full capacity operation.

Humidity controller set point should be in 50-60%

relative humidity area: Setting controller to lower

settings will result in excessive operating time

and operating costs for the electric reheat, and in

extreme cases could cause evaporator (indoor)

coil freeze-up if there are periods of light internal

equipment (heat) loading.