Segment length, Installation – Weidmuller IE-SWxx-M Managed Switch User Manual

Page 5

Advertising
background image

15

Segment Length

10 Base T

copper

100 m

100 Base TX

copper

100 m

100 Base FX

multimode fiber

2000 m Full Duplex

• connector SC and ST

Halb Duplex is not supported
1310 nm/ 62.5/ 125 µm optical budget 8 db
50/ 125 µm optical budget 4 dB

singlemode fiber

• connector SCS

9/ 125 µm cable 13 dB

Installation

The IE-SW14-24-M is for wall mounting and DIN-Rail mounting.

DIN-Rail mounting

Taking off the DIN-Rail

Wall mounting
Remove the infolded brackets
Fix the backets out-foulded

Only a qualified technician is allowed to install and operate the Switch.

There must be 25 mm free space on both sides for ventilation to the neighbour
on the DIN-Rail.

Advertising