Nspections and, Esting, Eplacement – Wood’s Powr-Grip CF1IFO User Manual

Page 2: Arts

Advertising
background image

Rev 4.0/3-09

APPENDIX • OPTION CF1IFO

#35170: 2

Installation

(see figure)

1) Support the pad frame {1} as described in the preceding Removal directions, and align the 4

mounting holes {4} in the rotation housing {3} with those in the innermost tubes of the pad
frame: First rotate the rotation housing so that its mounting holes will match those in the pad

frame. Then tilt the rotation housing to match the orientation of the pad frame. Finally, use the
hoist to move the lift bar assembly {5} into position so that the mounting holes align.
2) Install the 4 mounting bolts {6} one by one in the mounting holes: First apply a removable

thread-locking adhesive to the threads of a mounting bolt. Then use a hex key to tighten the

bolt until its shoulder seats securely against the rotation housing. Repeat for all bolts.
Note: Make sure the shoulder of each mounting bolt is contacting the rotation housing,

not

the

inside wall of the pad frame tube. When a bolt is installed correctly, the gap between the bolt
head and the pad frame should measure less than 1/8" [3 mm].
3) Attach the vacuum hose to the 2 barbs of the rotation fittings assembly {2}: Use a small

amount of glycerin on the inside of the hose to ease installation. Push the free end of each hose

over the corresponding barb. Make certain that both hoses are connected securely.
4) Perform Operational Tests of the pad frame and vacuum system (see I

NSPECTIONS AND

T

ESTING

to follow).

I

NSPECTIONS AND

T

ESTING

When performing inspections and tests of the lifter as directed in the MAINTENANCE section of

the main instructions, be sure to include the currently installed pad frame whenever applicable.

R

EPLACEMENT

P

ARTS

Stock No.

Description

28302

Loctite Threadlocker - Removable

SERVICE ONLY WITH IDENTICAL REPLACEMENT PARTS

SUPPLIED BY OR APPROVED BY WOOD'S POWR-GRIP CO., INC.

Advertising