Rockwell Automation 1336R REGEN Control Board Repl. User Manual

Page 2

Advertising
background image

Rockwell Automation helps its customers receive a superior return on their investment by bringing
together leading brands in industrial automation, creating a broad spectrum of easy-to-integrate
products. These are supported by local technical resources available worldwide, a global network
of system solutions providers, and the advanced technology resources of Rockwell.

Worldwide representation.

Argentina • Australia • Austria • Bahrain • Belgium • Bolivia • Brazil • Bulgaria • Canada • Chile • China, People’s Republic of • Colombia • Costa Rica • Croatia • Cyprus
Czech Republic • Denmark • Dominican Republic • Ecuador • Egypt • El Salvador • Finland • France • Germany • Ghana • Greece • Guatemala • Honduras • Hong Kong
Hungary • Iceland • India • Indonesia • Iran • Ireland • Israel • Italy • Jamaica • Japan • Jordan • Korea • Kuwait • Lebanon • Macau • Malaysia • Malta • Mexico
Morocco • The Netherlands • New Zealand • Nigeria • Norway • Oman • Pakistan • Panama • Peru • Philippines • Poland • Portugal • Puerto Rico • Qatar • Romania • Russia
Saudi Arabia • Singapore • Slovakia • Slovenia • South Africa, Republic of • Spain • Sweden • Switzerland • Taiwan • Thailand • Trinidad • Tunisia • Turkey • United Arab Emirates
United Kingdom • United States • Uruguay • Venezuela

Rockwell Automation Headquarters, 1201 South Second Street, Milwaukee, WI 53204-2496 USA, Tel: (1) 414 382-2000, Fax: (1) 414 382-4444

Publication 1336 REGEN-5.11 — May, 1998

P/N 189809 (01)

Copyright 1998 Rockwell International Corporation Printed in USA

Replacement
Procedure

Important:

If parameters were not previously uploaded, it is
recommended that they be uploaded now if possible.
Uploading parameters will allow downloading after the
new board has been installed, preventing complete
reprogramming. Parameters may be uploaded to a HIM
with upload/download capability, or to a hard drive using
DriveTools or DriveTools32.

1.

Remove and lock-out all incoming power to the 1336 REGEN Line
Regeneration Package.

a.

Remove the Precharge Unit front cover. Measure the voltage at
input power terminals R1–S1–T1 and terminal block TB1 with a
voltmeter to ensure that no voltage is present.

b.

Remove the Converter front cover. Measure the voltage at input
power terminals R2–S2–T2 with a voltmeter to ensure that no
voltage is present.

2.

Unplug all connectors to the old board including the (2) Fast-On
Connectors J15 and J16.

3.

Remove the screws securing the Converter Control Board.

4.

Install the new Converter Control Board, reconnecting all
connectors. Verify that all jumpers are correctly set. Refer to the 1336
REGEN User Manual for details.

!

ATTENTION:

Replace any guards or shields previously

removed before reapplying power to the 1336 REGEN Line
Regeneration Package. Failure to replace guards or shields
may result in death or serious injury.

5.

Reapply power. If a fault occurs, "Reset Defaults". Download
parameters if previously uploaded, or re-enter parameter settings as
previously recorded.

Advertising