Rockwell Automation 1494V-DS30_DS60_DS100_DS200 Disconnect Switch (30/60A - Series A) (100/200A -Series B or C) User Manual

Page 6

Advertising
background image

DISCONNECT SWITCH AND ACCESSORY

INSTALLATION INSTRUCTION SHEET

1

1004063

42052-064

OF

N/A

N/A

N/A

REVISION

AUTHORIZATION

DR.

CHKD.

APPD.

DATE

DATE

DATE

E - DOC

LOCATION: MILWAUKEE, WISCONSIN U.S.A.

B-vertical.ai

DWG.

SIZE

SHEET

B

1

2

3

4

5

6

7

8

A

B

C

D

E

F

G

H

REFERENCE

DIMENSIONS APPLY BEFORE

SURFACE TREATMENT

(DIMENSIONS IN INCHES)

TOLERANCES UNLESS

OTHERWISE SPECIFIED

.XX:

.XXX:

ANGLES:

42052

THIS DRAWING IS THE PROPERTY OF

ROCKWELL INTERNATIONAL CORPORATION

OR ITS SUBSIDIARIES AND MAY NOT BE COPIED,

USED OR DISCLOSED FOR ANY PURPOSE

EXCEPT AS AUTHORIZED IN WRITING BY

ROCKWELL INTERNATIONAL CORPORATION

---------------

---------------
---------------

---------------

---------------

---------------

6

9

1

2

3

Connecting

Rod

Min.

Max.

"N"

Standard

Extended

Catalog Number

1494V-RA3

1494V-RA4

6-3/4"

9-1/8"

9-1/8"

21-5/8"

Connecting Rod Installation

Right Hand Operation

Connecting Rod Adjustment Procedure

N

Enclosure

Working Depth

(Flange to

Mounting Plate)

N - 3"

Front

Install connecting rod in mechanism and
thread in clockwise (12) full turns

Place the disconnect handle in the "OFF" position. Insert the
ears of rod into the primary link of the handle and install the
hitch pin as shown below

4

5

"ON" Position

a) Move disconnect handle to the "ON" position.

b) If switch does not fully close, return handle to "OFF"
position.

c) Remove hitch pin and disengage the connectiong rod from the
primary link.

d) Turn connecting rod counter-clockwise (1) full turn.

e) Re-engage connecting rod in primary link of handle, insert
hitch pin and re-test

f) Repeat 4a - 4e as necessary.

"OFF" Position

g) Move disconnect handle to the "OFF" position.

h) If switch does not fully open, return handle to "ON"
position.

j) Remove hitch pin and disengage the connectiong rod from
the primary link.

k) Turn connecting rod clockwise (1) full turn.

l) Re-engage connecting rod in primary link of handle, insert
hitch pin and re-test

m) Repeat 5g - 5l as necessary.

(6)

Advertising