Installation – Rockwell Automation 1336_S_F_T COMMON BUS PRECHARGE BOARD REPLCMNT User Manual

Page 2

Advertising
background image

2

1336 PLUS, PLUS II, FORCE

& IMPACT

Common Bus Precharge Board Replacement

5. On C Frame drives, remove the hardware that fastens the sides of the Precharge

Board to the drive. On D-H Frame drives, loosen the standoffs and remove the
board.

Installation

1. Install the Precharge Board in reverse order of removal.

2. Verify the position of jumper W1.

3. Verify the wiring at TB1 on the Precharge Board.

4. Replace any guards and/or insulators previously removed.

Figure 1 Precharge Board Component Locations

!

ATTENTION: To guard against component and/or drive damage,
assure that the wires on the harness terminals are properly aligned
with the J3 connector pins on the board. Incorrect harness
connection may result in erratic drive operation and may damage the
equipment.

Position

Voltage

1 -> 2

24V DC

2 -> 3

120V AC

Terminal

Connection

TB1-1

Power (+24V DC or 120V AC)

TB1-3

Common

J3

J1

J2

TB1

Mounting
Brackets

Washer

C Frame Drives

D-H Frame Drives

Nut

W1

J3

Standoff - 4 Places

J1

J2

TB1

W1

Publication 1336-5.90 – April, 2000

P/N 303713 (01)

Copyright 2000 Rockwell International Corporation. All rights reserved. Printed in USA.