Rockwell Automation 1494V-DS400_DSX400 - Series D Variable Depth 400A Disconnect Switch User Manual

Page 2

Advertising
background image

PN-133642

DIR 42052-156 (Version 03)

Copyright © 2013 Rockwell Automation, Inc. All Rights Reserved. Printed in USA.

ATTENTION: Check for proper operation.

Go to Installation Instruction Sheet 42052-154-01.

Trailer Fuse Block Installation

5

3

Connecting Rod Installation

4

Cutting Connecting Rod

(Cut (2) Connecting Rods; first rod connects the handle to the switch, second rod provides

stiffening for the enclosure flange)

Measure working depth of enclosure.

Measure, mark and
cut (2) connecting rods.

1

2

Remove burrs

3

N

N minus 3-3/4"

Enclosure

Working Depth

(Inside Flange

of Enclosure to

Mounting Plate)

Mounting

Plate

Drive Bar

2

Rotate connecting rod into

drive bar 16 turns.

3

4

Pull rod up and verify if
rod is touching bottom of
spring bracket. (If not,
rotate rod until it touches
spring bracket)

Zero

Clearance

8

7

Connecting

Rod

Hitch Pin

Primary Link

5

6

First rod connects the handle to the switch

Second rod provides stiffening for the enclosure flange

10

9

11

150 - 200 lb-in

Verify that disconnect switch and handle are in "OFF"
position. (Switch blades will be visible.)

1

Allen-Bradley, Rockwell Software, and Rockwell Automation are trademarks of Rockwell Automation, Inc.
Trademarks not belonging to Rockwell Automation are property of their respective companies.

Publication 1494V-IN102C-EN-E - January 2013

Advertising