Blodgett SB-10E User Manual

Page 6

Advertising
background image

6

3.0 OPERATING INSTRUCTIONS

BOILER SECTION

Electrically powered steam generators are available with standard boiler controls or ASME
CSD-1 compliant controls. In addition to the ON/OFF power switch and indicator pilot light
on the standard controls, the CSD-1 controls come with four more indicator pilot lights and a
“Reset” switch. Follow the appropriate instructions for each.

Start-up Procedure, Standard Controls

1. Turn on water and power supply to appliance.

2. Close the manual blowdown valve if the units is not equipped with the optional automatic

blowdown valve.


3. Open door of cabinet and turn on Power Switch. Pilot light will come ON and water will

begin to enter boiler. Once water level has reached the proper operating level as
indicated on water gauge glass the heating elements will be energized and heat the
water. When steam pressure has reached 11 psi the elements will de-energize and
cycle on and off between 9 - 11 psi. The boiler is now ready for steam generation.


Start-up Procedure, CSD-1 Controls

1. Turn on water and power supply to appliance.

2. Close the manual blowdown valve if the units is not equipped with the optional automatic

blowdown valve.


3.

Open cabinet door and turn "ON" power switch. The green pilot light will come "ON.”
Water will begin to enter the boiler. When enough water has entered the boiler the (red)
“Low Water” pilot will come on for approximately 10 seconds and then the (amber) pilot
light will come.

4.

Press the “Reset” switch to begin boiler operation. The “Standby” pilot light will go off
and the boiler will begin operation. When steam pressure has reached 11 psi the
elements will de-energize and cycle on and off between 9 - 11 psi. The boiler is now
ready for steam generation.

Advertising
This manual is related to the following products: