Nail inspection, Required maintenance, Nail inspection required maintenance – Backyard Storage Solutions 18276-1 User Manual

Page 28: Tejas, Not included), No incluidas)

Advertising
background image

26

NAIL INSPECTION

x 40

REQUIRED MAINTENANCE

Check for protruding nails, pound any protruding

nails into the wood or cut them off flush.

Cut Shingles into 3 pieces

Corte las tejas en tres partes

Apply pieces to ridge as shown

Fije las piezas a la cumbrera

como en el dibujo

x 40

Ridge Cap

NAIL INSPECTION

REQUIRED MAINTENANCE

Tapa de cumbrera

Inspeccione para clavos sobresalientes; hinque

clavos sobresalientes en la madera or córtelos
nivelados con la madera.

Keep grass trimmed and away from building

Corte y quite la hierba cerca del edificio.

Keep Sprinklers away from building

Repaint building as needed and in accordance
with paint manufacturer requirements

No use rociadores cerca del edificio.

5-1/

8

"

(1

3

cm)

5-7/

8

"

(15 cm)

Pinte el edificio de nuevo cada dos años.

INSPECCIÓN DE CLAVOS

MANTENIMENTO NECESARIO

SHINGLES

(Not Included)

TEJAS

(No Incluidas)

Roof P

a

nel

N

a

il Th

a

t Mi

ss

ed St

u

d

Trim N

a

il

s

Not in St

u

d

s

Advertising
This manual is related to the following products: