Diagram 1 – Balboa Water Group Corona Discharge Ozone User Manual

Page 2

Advertising
background image

OEM installation

The effectiveness of the ozone generator is dependent on the design delivery
system per each manufacturer. It is the responsibility of the installer to follow the
installation procedures set forth by the manufacturer. Failure to do so will void the
warranty. Diagram 2 shows the basic layout recommended for the installation of
Balboa’s Ozone Generator.

1. Turn off all power.

2. Loop the hose into a “Hartford Loop” and have the upper part of the loops
positioned above the water line level as shown. Failure to do so could result in
water intrusion, which is not covered by the warranty. Attach the hose to the ozone
LQMHFWRU¿WWLQJRQWKHVSDSOXPELQJ,QVWDOOWKHFKHFNYDOYHVRWKDWWKHDUURZSRLQWV
LQWKHGLUHFWLRQRIDLUÀRZIURPWKHJHQHUDWRUWRWKHR]RQHLQMHFWRU 'LDJUDP 

1RWH,I\RXGRQRWSURSHUO\LQVWDOOWKHFKHFNYDOYHWKHDLUÀRZZLOOEHEORFNHGIURP
going into the spa/pool and will not perform the ozonation process.

3RZHUXSWKHV\VWHPDQGEULHÀ\UXQWKH¿OWUDWLRQSXPS3ODFH\RXU¿QJHURYHU
WKHHQGRIWKHKRVHQHDUWKHFKHFNYDOYH<RXVKRXOGIHHODVOLJKWVXFWLRQ,IQRW
FKHFNIRUKRVHNLQNVKRVHREVWUXFWLRQVDQGWKDWWKHFKHFNYDOYHLVLQWKHSURSHU
direction. When suction is obtained, attach the hose from the generator to the
barbed output of the ozone generator.

 7XUQ RII WKH FRQWURO V\VWHP DQG KRRN WKH SRZHU FDEOH WR WKH FRQWURO V\VWHP
PDUNHGIRU2]RQH )ROORZWKHV\VWHP¶VZLULQJGLDJUDPIRUWKHSURSHUORFDWLRQ 

7XUQWKHV\VWHPSRZHUEDFNRQDQGUXQWKHSXPS&RQ¿UPWKDWWKHOLJKWLQWKH
Ozone window is ON.

FOR REPLACEMENT 6\VWHPZLWK$03FRQQHFWRURQWKHRXWVLGHRIWKHER[
1. Follow the above steps (1-4).

8QFRYHUWKHFRQWUROOHUER[0DWFKWKHZLUHV¶RXWSXWRIWKHR]RQH$03FRQQHFWRU
PDUNRQWKHRXWVLGHRIWKHER[ZLWKWKH$03FRQQHFWRUSURYLGHGZLWKWKHR]RQH
generator. Refer to Diagram 3.
,QVHUWWKHZLUH<RXZLOOIHHOLW³FOLFN´LQWRSRVLWLRQZKHQLWLVVHDWHG$VOLJKWWXJ
on the wire is all that’s needed to be sure that the terminal is seated.
4. Mate the AMP connector and power up
WKH VSD 0DNH VXUH WKDW \RX DUH LQ ¿OWUDWLRQ
F\FOHDQGFRQ¿UPWKDWWKHOLJKWRQWKHR]RQH
generator window is on.

Both diagrams, Diagrams 1 & 2,
show that the ozone generators must
be mounted with their inlets facing
down. As shown (right), the chip
generator outlet will be pointing to the
left once installed.

Diagram 1

Power Cords

Air Inlet
(near power cord)

C H P