Bendix Commercial Vehicle Systems QR-N QUICK RELEASE VALVE User Manual

Page 3

Advertising
background image

3

6. Devices with stripped threads or damaged parts should

be replaced. Repairs requiring machining should not be
attempted.

REMOVING THE QR-N

VALVE

1. Park the vehicle on a level surface. Block the wheels

and/or hold the vehicle by means other than the air
brakes.

2. Drain all air brake system reservoirs.

3. Identify, mark and disconnect all air lines from the valve.

4. Remove all tubing or hose fittings from the valve.

5. Remove the valve mounting hardware and the valve.

DISASSEMBLY

The following disassembly procedure is provided as a
reference. Before disassembling the QR-N

valve, a Bendix

maintenance kit or genuine replacement parts should be
available.

1. Remove the four 1/4" flange nuts and bolts that secure

the upper and lower body halves. NOTE: Before removing
the last two nuts and bolts completely, check the opening
between the body halves to determine if the QR-N

valve

has a differential spring installed. If so, a light spring
load should be anticipated and can be easily controlled
by manually holding the body halves together.

2. Separate the body halves and remove the diaphragm

(and diaphragm follower and spring if so equipped).

3. Remove the sealing ring between the body halves.

CLEANING & INSPECTION

1. Clean the upper and lower body halves; also diaphragm

follower and spring (if applicable) in mineral spirits. Do
not immerse nonmetallic components for a prolonged
period of time (no more than 10 minutes). Dry all parts
thoroughly.

2. It is recommended that the diaphragm and sealing ring

be replaced after disassembly.

3. Inspect the upper body for galled threads and cracks. If

found, the entire QR-N

valve should be replaced.

4. Inspect the interior valve portion of the lower body for

heavy corrosion and pitting. If found, replace the entire
QR-N

valve assembly.

5. If applicable, inspect the diaphragm follower and spring

(if applicable) for any corrosion and pitting, replace if
necessary.

ASSEMBLY

1. Place the supply port of the upper body down on a clean,

level work surface. Install the flat circular diaphragm in
the upper body making certain it is CENTERED.

2. If applicable, install and center the diaphragm follower

with its flat flange side against the diaphragm. Install
the spring on the diaphragm follower.

3. Install the sealing ring on the lower body and carefully

install the lower body on the upper body. Make certain
that the diaphragm remains centered in the upper body
and the sealing ring enters its groove in the upper body.

4. Install the four 1/4" flange nuts and bolts and torque to

60 inch pounds (6.78 N.M).

INSTALLING THE QR-N

VALVE

1. Mount the QR-N

valve on the vehicle.

2. Install the tubing or hose fittings in the upper body of the

QR-N

valve. If a thread sealant is used, make certain

that this material will not enter the valve during use.
IMPORTANT: WHEN INSTALLING FITTINGS, DO NOT
TORQUE BEYOND;

12 ft. lbs. (16.3 N.M) for the supply port

10 ft. lbs. (13.6 N.M) for the delivery ports

OR DAMAGE TO THE UPPER BODY MAY RESULT.

3. Connect the air lines to the QR-N

valve as identified in

Step 4 of the “Removal”.

4. Perform the “Operating and Leakage Tests” before placing

the vehicle in service.

Advertising