Operational test, If the trailer is equipped with an r-12p, Valve – Bendix Commercial Vehicle Systems TRAILER SYSTEM GUARD AIR DRYER 7/04 User Manual

Page 5

Advertising
background image

5

2. Connect the supply and control lines to the Trailer

System-Guard

air dryer making sure to keep the control

and supply circuits separate as shown. Do not switch
lines end to end. All ports are identified as indicated in
figures 1 and 2.

3. Affix the Alcohol Warning Decal to the trailer bulkhead.

Before applying the decal remove all oil and road
contaminants from the mounting location with a good
cleaning solvent.

OPERATIONAL TEST

Build the air system to governor cutout. Shut off the engine.
Using a soap solution, check all lines and fittings leading
to and from the Trailer System-Guard

air dryer for leakage

and integrity. Repair any excessive leaks - exceeding a 1"
bubble in 5 seconds - before restoring vehicle to service.

Supply

Trailer

System-Guard

Air

Dryer

FIGURE 4 -TRAILER SYSTEM-GUARD

AIR DRYER PLACEMENT

"12 IN

SUP"

"11 IN

CONT"

R-12

Relay

Valve

Spring

Brake
Valve

Reservoir

"22 OUT

SUP"

"21 OUT

CONT"

Spring

Brake

If the trailer is equipped with an R-12P

valve, the trailer systems guard must be
mounted upstream of the R-12P

valve.

Advertising