Installation instructions – Brandmotion 9002-8532 User Manual

Page 3

Advertising
background image

 

INSTALLATION  INSTRUCTIONS  



8532 Instructions 5-19-14.docx

Page 3 of 5

Step 11: Align the Camera Harness head so the
key lines up with the slot in the camera, and plug
in the connector. Snug the supplied screws with a
Phillips Screwdriver to create a watertight seal but

do not over tighten.
Step 12: Mount Camera using supplied
hardware.
Insert the supplied rubber Well Nuts
into the two outer Camera Mount holes and use a
Phillips Screwdriver to thread the supplied Bolts in

but do not tighten them down just yet.
Step 13: Connect Camera Harness to gray
connector end of supplied Chassis Harness.

Step 14: Secure Camera Harness to factory wiring
using supplied Wire Tires.

Step 15: Route Camera and/ or Chassis Harness
along existing wiring and secure using supplied
Wire Ties. IMPORTANT: Ensure harnesses move
freely with the trunk or liftgate.

Step 16: Route Chassis Harness forward. It
may be necessary to remove sill plates, pillar
covers, seat bottoms, side panels, etc. Use a plastic
trim removal tool to avoid damage to trim pieces.
In some cases, seatbelt bolts at the bottom of the
pillars must be removed. (CAUTION: Any bolts
removed for safety devices must be retightened to

manufacturer’s specified torque specifications.)

WARNING: Disable airbag system before attempting any steering
wheel, steering column, or instrument panel component diagnosis or
service. Disconnect and isolate negative battery (ground) cable, then
wait two minutes for the airbag system capacitor to discharge before
performing further diagnosis or service. Failure to take the proper
precautions may result in accidental airbag deployment and possible
serious or fatal injury.

Step 17: Route supplied Chassis Harness under
carpet to center dash/console area.

CAUTION: Keep harness away from accelerator, brake
pedal, and parking brake assembly.

Step 18: Use a Plastic Trim Removal Tool to
remove console and dash trim pieces to gain

access to the radio bezel.

INSTALLATION NOTE: Use a Digital Multimeter to
confirm Ignition power and Ground circuit voltage and
polarity. Solder all wire splices & cover with Heat
Shrink Tubing (recommended) or use T-taps as

optional connection method.

Step 19: Wire Chassis Harness. Connect both
the Red and Green wires of supplied Chassis
Harness to the vehicle wire that supplies Keyed
Ignition 12v + and the Black wire to Ground
according to model and year using charts below.

2011 – current

Chrysler Town & Country
Dodge Grand Caravan
Ram Tradesman

Location: Remove front storage bin cover to access 12v power outlet
wiring harness (1) and unwrap harness cover to expose wires inside.

Keyed Ignition power 12v + Ground
Splice Red & Green wires from
supplied Chassis Harness to
Dark Blue/Pink wire.

Splice Black wires from supplied
Chassis Harness to Black wire.

Advertising