Pm t v er sio n u pda te – Bully Dog PMT 07.5-08 Dodge 6.7L Cummins Version 1.0.1.5 User Manual

Page 3

Advertising
background image

PM

T V

er

sio

n U

Pda

Te

Parts Installation:

refer to the PMT installation Manual to identify the parts
described below. The installation overview provides a
quick reference installation guide for the 6.7L Cummins.
see the install overview below. There are three general
steps that need to take place to install the PMT on the
6.7L Cummins:

1. The first step in installing the PMT and all of the parts
is determining the mounting position for the PMT. There
are two mounting positions offered for the PMT: add on
dash Mount and Universal dash mount. see the PMT
mounting section in the PMT instruction Manual to
reference installing the dash Mount.

2. The second step includes running the Cradle
Cable from the PMT mounting position down
to the oBd ll block, and plugging it into the
oBd ll block. see the oBd ll diagram below to
see the location of the oBd ll port and how the
Cradle Cable plugs into the oBd ll block. For in-
depth instructions refer to the PMT installation
manual.

3. run the Power Wire through the fire wall, from inside the cab, and
into the engine bay. This can be done without drilling holes by accessing
on of the exiting holes used to run oeM wiring harnesses. once in the
engine bay locate the fuse box which can be found near the drivers side
headlight. open the fuse box and locate fuse number 28. Using the fuse
jack and spade connector, connect the power wire to fuse number 28.

Installation Overview

PMT & Cradle

OBDII Adapter Plug

OBDII Port

Cradle Cable

Power Wire

Fuse Box

Fire wall grommet

‘07.5-’08 6.7L Cummins Installation Overview

‘07.5-’08 6.7L Cummins OBD ll diagram

Connect power to Fuse 28

Advertising