44 • Cage and Blade Installation

ClearCube Product Manual and Installation Guide

6. Attach the AC power cord(s) packaged and supplied with the Cage/BackPack and

route it to the rear panel power connector(s) and then to a surge-protected power

source such as an uninterruptible power supply (UPS) or power strip. Use the

cable retention clamp on the Cage to avoid inadvertently disconnecting the power.

Use the AC power cord packaged and supplied with the Cage/BackPack. For

systems shipped to countries that utilize a 110–130-volt power system, the power

cord is rated at 15 amps. Systems shipped to countries with a 208-volt power

systems are packaged with power cords rated at 10 amps. Older model

BackPacks utilized 10 amp-rated power cords that are NOT approved for use with

current model BackPacks on 110–130-volt power systems. The standard 10 amp

power cords are acceptable for use with the Fiber Transceiver. Refer to the Safety

Guidelines on page 7 for more information.

At this point, if the installation of a ClearCube system is part of a larger office renovation

or build-out, complete the Cage hardware installation and wiring, but delay installation of

the PC Blade computers until the rest of the area has been finished and cleaned.

If installing R4300 series BackPacks, the modules can be installed now, but

installation should be delayed until construction clean-up has been completed.

Modules are required to complete cabling, but preliminary cabling for C/Ports and

I/ports can be completed without the modules being installed.

Figure 16 Side View of Cage Centered in a 2-Post Rack