7 connecting the eluent degasser, 8 installing the high-pressure pump, 9 installing an inline filter – Metrohm 940 Professional IC Vario User Manual

Page 26: 10 installing the pulsation absorber, 11 injection valve, 12 installing the detector, Connecting the eluent degasser, Installing the high-pressure pump, Installing an inline filter

Advertising
background image

4.7 Connecting the eluent degasser

■■■■■■■■■■■■■■■■■■■■■■

18

■■■■■■■■

940 Professional IC Vario ONE (2.940.1100)

4.7

Connecting the eluent degasser

The eluent degasser is completely connected. No installation work is
required.

4.8

Installing the high-pressure pump

The high-pressure pump is completely connected. No installation work is
required.

4.9

Installing an inline filter

The inline filter is completely connected. No installation work is required.

4.10

Installing the pulsation absorber

The pulsation absorber is installed between the high-pressure pump and
the injection valve. It protects the separation column from damage caused
by pressure fluctuations such as those when switching the injection valve,
and reduces interfering pulsations during highly sensitive measurements.

The pulsation absorber is completely connected. No installation work is
required.

4.11

Injection valve

The injection valve is completely connected. No installation work is
required.

4.12

Installing the detector

The 940 Professional IC Vario provides enough space for two detectors
and additional accessories in the detector chamber. The detectors are
available as accessories and are supplied with separate manuals.

Placing the detector in the instrument
Follow the instructions in the chapter Inserting the detector in the manual
for the detector.

Advertising