6 program update with tiamo multi – Metrohm tiamo 2.0 Installation User Manual

Page 10

Advertising
background image

10

8.101.8002EN

7

Caution

During updating older tiamo versions to tiamo 2.x the databases will be
converted to the new version. Depending on the size of the database,
this can take some time. For each database a progress bar is displayed
which informs about the status of the conversion.

The computer or Windows must not be restarted or shut down as long
as the conversion runs!

Complete the installation with [Finish].

An UpdateLog file with a list of all files having been copied to your com-
puter and with a confirmation for a successful installation is saved in the
tiamo installation folder (default: C:\Program Files\Metrohm\tiamo) under
bin\InstallLog.

6 Program update with tiamo multi

During the program update, the configuration database (system configuration,
methods, templates, user-specific data for all clients) and the determination
databases on the server are automatically updated for further use with tiamo
multi
.

Advertising
This manual is related to the following products: