Fris19-50r – Hinkley Lighting BARCELONA FR44107SLF User Manual

Page 3

Advertising
background image

HANGING INSTRUCTIONS FOR FIXTURES THAT WEIGHT MORE THAN 50LBS

FRIS19-50R

SAFETY WARNING:

Read wiring and grounding instructions [FRIS 18]

and any additional directions. Turn power supply off during installation. If new wiring

is required, consult a qualified electrician or local authorities for code requirements.

STEP 1

1

Shut off electrical current before starting. If the fixture you are replacing is

turned on and off by a wall switch, simply turn the switch off. If not, remove the

appropriate fuse (or open the circut breakers) until the fixture is dead.

• DO NOT restore current - either by fuse, breaker or switch - until the new

fixture is completely wired and in place.

2

Supply wires shall enter the outlet box (a) through any knockout EXCEPT the top

center knockout - See Drawing 1.

STEP 2

1

Fixture is to be mounted by a 3/8 steel pipe with 3/8 -18 NPSM thread, 3/4”

threads at both ends (not supplied). Pipe should be anchored to structure or

bridging member with sufficient strength to support 4 times the fixtures

weight - see Drawing 2.

2

Adjust pipe so 1/2” of 3/8 steel pipe extends into the junction box, at the center

knock out.

3

Please refer to the back of this sheet to the safety cable installation instructions

and ONLY complete steps 1 and 2 at this time.

STEP 3

1

Thread pipe coupler (b) onto protruding pipe inside outlet box. Secure in place

by tightening allen head screw (c) -

see Drawing 1 .

2

Thread hexnut (d) onto threaded nipple (e). Thread nipple (e) into coupler (b).

Secure in place by tightening hexnut (d) against coupler (b) and then tightening

allen screw (f) .

3

thread hexnut (j) onto nipple (e). DO NOT tighten hexnut

(h) at this time.

4

Thread screw collar loop (k)

Adjust screw collar loop height so the half of the exterior thread on

screw collar loop (k) is exposed when canopy (l) is held up to the ceiling.

STEP 4

1

Determine length of chain you will require. Attach one end of length of chain to

fixture.

2

Slip threaded ring (m) and canopy (l) onto chain - see Drawing 1.

3

Attach fixture with chain to screw collar loop (k). Please get assistance, weight

and size of fixture is difficult to manage alone.

4

Weave ground wire, supply wire, and safety cable through chain, up through center

of screw collar loop (k), through center of nipple (e) , and out the opening on the

side of coupler (b).

[DRAWING 1]

[DRAWING 2]

5.28.08

800.421.3517 WWW.FREDRICKRAMOND.COM

ceiling
joist

ceiling
joist

support
block

junction
box

bridge

supply wire

hex nut

3/8 steel pipe

a
b

c
f

d

e

l

m

top center
knockout

3/8 steel pipe

h

j

k

wire

safety
cable

ground
wire

onto end of nipple (e)

5

After screw collar loop (k) is adjusted properly , tighten hex nut (j) against
screw collar loop (k) to secure loop.

Advertising
This manual is related to the following products: