Parts needed, Installation steps – Watts PWPERMKIT User Manual

Page 4

Advertising
background image

4

Permeate Pump Installation

with the Manifold System

Parts Needed

(1) Permeate Pump with mounting clip
(2) Quick-Connect Reducer Union
(2) 3" long,

1

4

" Blue tubes

(1) 48" long,

1

4

" Blue tube

(1)

3

8

" Quick-Connect Union Tee

(1)

3

8

" Plug Insert

NOTE: The Permeate Pump is equipped with ¼" Quick-Connect

push-to-connect fittings. The pump can be used in RO systems

with

3

8

" tubing by inserting a short piece of

1

4

" tubing into the

port on the Permeate Pump and attaching a Quick-Connect

Reducer Union to the tubing. Also, when mounting the Perme-

ate Pump, make sure the outlet ports of the Permeate Pump are

above the inlet ports in order to allow entrapped air to escape

1. Turn off the incoming water to the reverse osmosis unit. Lift the

handle on the reverse osmosis drinking water faucet to drain the

water from the system and storage tank .

Note: If tank is equipped with a ball valve, close valve to

preserve the tank water.
2. Before installing the Permeate Pump, remove the blue tube in-

serts from the ports . Refer to the diagram on Page 2 for instruc-

tions for disconnecting from a Quick-Connect fitting .

3 . Remove the

3

8

" Blue tube from the manifold “TANK” port and

insert the

3

8

" Plug

4 . Locate the

3

8

" Blue tube from the manifold “FAUCET” port and

cut approximately 24" from the manifold and re-route into the

Permeate Pump “PERMEATE IN” port using a Reducer Union

and a 3" long,

1

4

" Blue tube.

5 . Insert the

3

8

" Blue tube from the faucet into the Permeate Pump

“PERMEATE OUT” port using a Reducer Union and a 3" long,

1

4

" Blue tube.

6 . Locate the

3

8

" Blue tube between the faucet and Permeate

Pump, and then cut and insert the

3

8

" Union Tee.

7 . Insert the

3

8

" Blue tube leading to the tank into the open port of

the

3

8

" Union Tee

8 . Locate the

1

4

" Red tube between the manifold “DRAIN” port

and the faucet air gap inlet and then cut the tube 24" from the

manifold (Making sure to leave the flow restrictor plugged into

the manifold) Insert the red tube from the manifold into the Per-

meate Pump “BRINE IN” port and the red tube from the faucet

into the Permeate Pump “BRINE OUT” port.

9 . Make sure your installation matches the diagram shown in

Figure 2

10. Turn on the water supply. Check for leaks periodically for the

next 24-48 hours as the system fills and again after it shuts off

when the tank is full .

Installation Steps

Advertising