Elevator linkage installation – E-flite BAe Hawk 15 DF ARF User Manual

Page 19

Advertising
background image

19

E-flite BAe Hawk ARF Assembly Manual



13. Break in the elevator hinges by moving the

elevator through its range of motion a few times.

This will help in reducing the initial load on the

servo and make the control surfaces easier to

move initially.

14. Repeat Steps 5 through 13 to install the

remaining elevator.

Elevator Linkage Installation

Required Parts

Assembled airframe
Elevator control horn (2)
Elevator pushrod keeper (2)
Elevator pushrod wire, 24

7

/

16

-inch (620mm) (2)

Required Tools and Adhesives

Hobby knife w/#11 blade

Needle-nose pliers Medium CA

1. Slide the elevator pushrod tube back into

position in the fuselage. When the pushrod is in

the correct position it will be at the very bottom

of the slot in the former.

2. Tack the pushrod into position on the former with

medium CA as you might need to break it loose if

maintenance is required to the fan and motor.



3. Use a hobby knife to make a slight bevel inside

the hole of the elevator control horn. Rotate the

hobby knife like a drill to make the bevel even. This

will help when installing the control horn onto the

elevator control horn wire.



4. Thread the elevator control horn onto the

elevator control horn wire. The end of each control

horn will be flush with the end of the wire as shown

in the photo.

Advertising