Tools needed: medium phillips screwdriver, Step 1: lay out all components. (see diagram 1) – New Buck Corporation ZCBB User Manual

Page 13

Advertising
background image

INSTALLATION INSTRUCTIONS FOR MODEL ZCBB OPTIONAL
WOODEN SURROUND (WS) (KIT# PAKDMZCBB)

CLEARANCES:
1. Sidewall Clearances: Clearances from the side of the firebox opening to any adjacent

combustible wall should not be less than 7". See Figure 4

2. Ceiling Clearances: The ceiling height should not be less than 42" from the top of the firebox

opening.

ASSEMBLY INSTRUCTIONS:

Tools Needed: Medium Phillips Screwdriver

Step 1: Lay out all components. (See diagram 1)

Step 2: Assemble end panels (A & B) to top front rail ( C ).

Step 3: Stand end panels and top front rail onto base (hearth) and fasten down with screws provided
(See diagram 1).

NOTE: Position back of end panels with back of base (hearth) centering assembly from each end. In-
stall front screws first, then pull back towards the inside to square the surround up. Install screws
through back holes.

Step 4: Place top onto surround, flush with back and equal on each end. Secure both ends and middle
with screws provided.

CONTINUED

11

Advertising