Kino Flo VG3R Ballast Board User Manual

Page 3

Advertising
background image

Ballast Board Removal

Ballast Board Installation

1) Remove ten (10) cover screws.

4) Install new ballast board and

three (3) nuts.

2) Remove AC input and output

connector and HO/Std connector.

5) Install AC input and output

connector and HO/Std connector.

3) Remove three (3) nuts on each

board.

6) Install ten (10) cover screws.

3

4Bank Ballast (BAL-410-S120)

is shown for illustration purposes.

Advertising