Powers 595 Series 11 Self-Operating Temperature Regulators - Thermal System User Manual

Installation instructions, No. 11 regulator thermal system replacement

Advertising
background image

TO REMOVE THERMAL SYSTEM

1. Stop flow of fluid through the valve and line.
2. Drain tank or receptacle until fluid is below the level of the

bulb. If bulb is provided with separate well, the tank need
not be drained.

3. Unscrew retaining nut and remove bulb, leaving tank fitting

in position. CAUTION: Do not remove housing while bulb is
hot. Cool bulb at least 11°C [20°F] below lowest point on
the range. If regulator’s lowest range point is below 21°C
[70°F ], place bulb in ice water before proceeding. If lowest
point is below 7°C [45°F], pack in ice.

4. Note original position of temperature adjusting nut

assembly so it can be reset after installing the new ther-
mal system.

5. Turn adjusting nut assembly from right to left, releasing all

the spring force. Remove housing bolts and position indi-
cator and lift off thermal system.

TO INSTALL THERMAL SYSTEM

1. Place housing in position and replace housing bolts. If sys-

tem has range below 21° to 54°C [70° to 130°F], chill bulb
as described above before placing system in position.

2. Reset temperature nut assembly to its original position.
3. Slip bulb into position and tighten retaining nut securely.

(25mm x 229mm x 25mm x 508mm [1

x 9

x 1

x 20

]

bulbs installed horizontally must be installed with flat sur-
face marked “TOP” facing forward.)

TO TEST THERMAL SYSTEM

1. a. Heating regulators: raise temperature to the point at

which valve plug is seated.

b. Cooling regulators: raise temperature until valve is

just open.

2. Place a ruler on top of the packing gland assembly. Mark

the position where the ruler touches the stem.

3. a. Heating regulators: cool the bulb 16°C [30°F] below

control point so valve is fully open.

b. Cooling regulators: cool the bulb to the control point

so that valve is seated.

4. Place the ruler on packing gland assembly again, and

measure the distance the stem has moved. This stem
travel should be a minimum of 3.2mm for 13mm [1/8

for

1/2

] regulators to a minimum of 14.3mm for 98mm

[9 /16

for 4

] regulators. If there is no movement or only

partial movement, the system is defective and the near-
est Powers representative should be contacted.

For additional information on the No. 11 Regulator, refer to
Technical Instruction Forms TI595CD, TI595ST, TI595WM, and
TI595DB, or contact your nearest Powers representative.

INSTALLATION INSTRUCTIONS

No. 11 Regulator

Thermal System Replacement

1

2

3

4

5

Thermal

System

6

7

8

9

10

11

12

13

14

15

16

Item

Part Name

1

Bulb

2

Retaining Nut

3

Housing

4

Bellows

5

Piston Plate

6

Spring

7

Stem Extension

8

Adjusting Screw

9

Housing Screws

Item

Part Name

10

Temperature Adjusting
Setting Scale

11

Temperature Adjusting
Nut Assembly

12

Yoke and Bridge Assembly

13

Stem Lock Nut

14

Valve Stem

15

Yoke Lock Nut

16

Valve Bonnet

Not
Separable

OPERATING TOP PARTS LIST

II595-TSR

Form

II595-TSR 0218

EDP# 6507705

Printed in U.S.A.

USA office: Phone: 800.669.5430 • Fax: 847.824.0627

www.powerscontrols.com

Canadian office: Phone: 888.208.8927 • Fax: 888.882.1979

© 2002 Powers, a Watts Industries Co.

A Watts Industries Co.

Advertising