Installation

n

Biltmore Series 900

Pressure Balancing Valves

Technical Instructions

IS-P-900

NOTE:

Installation should be in accordance with accepted

plumbing practices. Flush all piping thoroughly before instal-

lation.
1. Position mixer 1

15

/

16

" ±

1

/

2

" [49mm ± 13mm] from inlet center

to finished wall surface. The tub outlet port is marked "TUB"

and should face down. Facing front of mixer, connect hot

water to left side and connect cold water to right side. The

valve has "C" and "H" cast into the body near the appropriate

inlet ports.

2. For standard inlets: Valve is factory-set for standard inlets

("TOP" stamped on stem should face shower outlet "S", see

Figure 3.) If reversed inlets are required due to back-to-back

installation (Cold water supply on the left and Hot water

supply on the right), see Figure 3 and follow instructions a–d

below:

a. Connect cold inlet to hot port ("H") and hot inlet to cold

port ("C"). NOTE: Do not turn valve upside down. If

valve is upside down, water will not flow properly

through tub spout or showerhead.

b. Turn water off with checkstops, remove high temp.

limit stop and bonnet.

c. Rotate stem 180°, and reinstall bonnet and high temp.

limit stop.

NOTE:

Be certain the word "TOP" stamped on stem is facing

toward tub outlet "T".
d. Hot and Cold inlets should be re-identified for reversed

inlets to avoid confusion during future maintenance.

3. For tub and shower installations, see Figure 1. Pipe bottom

outlet port "T" directly to the diverter tub spout. The Biltmore

mixer body is designed to operate without the use of a twin

ell. Pipe top outlet port "S" to the showerhead.

Be certain that the bottom outlet port "TUB" is piped to the

tub spout; if outlet connections are reversed, the mixer will

not function properly.

4. For shower only installation, see Figure 2. Pipe top outlet

port "S" directly to the showerhead and plug bottom port.

5. Rough-in guide installation…
a. When piping installation is completed and before doing

the finished wall, slide rough-in guide onto the mixer

stem and press fit into place. (See Figure 5.)

b. The rough-in guide will insure the proper size opening

for mixer and checkstop shutoff and repair accessibil-

ity, as well as protect the chrome plated sleeve from

damage during drywall and tile installation.

6. To install dial gaskets, peel backing off gaskets and attach

gaskets to inside of dial plate.

7. After wall is completed, remove rough-in guide and attach

dial assembly and handle to mixer body with the screws

furnished. See Figure 4.

CAUTION:

When soldering during installation process, do

not heat the valve any higher than the temperature required

to flow solder. Excessive overheating of the valve may cause

damage to the balancing cartridge mechanism. By following

this recommendation, you will be able to solder the valve

without removing either the cartridge or the checkstop inter-

nals. If either brazing or resistance (electric) solder is to be

used, all valve internals must be removed.
8. Maximum temperature setting must be set at the job site.

High temperature limit stop is located on the bonnet.

Remove O-ring and discard. Slide the retainer and the high

temperature limit stop out. Rotate stem to desired maximum

temperature, but no greater than 115°F (46°C). Slide back

the maximum temperature limit stop touching the tab on the

stem. Slide the retainer back all the way to secure the high

temperature limit stop. Install handle.

The maximum temperature setting must be re-adjusted if the

hot water supply temperature is changed, and also season-

ally to compensate for changes in the cold water supply

temperature.

Figure 1: Rough-in Dimensions – Tub and Shower

TUB OUTLET
TO BE PLUGGED.
PLUG BY OTHERS.

5" [127]

A

24" [609]
APPROX.

WALL

1-7/16" [37] MIN.
2-7/16" [62] MAX.

1/2" [13]

1/2" IPS CONNECTIONS
OR
1/2" COPPER SWEAT
CONNECTIONS

1/2-14" NPT
MALE INLET

ALL DOTTED LINE PIPING SUPPLIED BY OTHERS.

78" [1981]
APPROX.
TO FINISHED
FLOOR

4-5/8" [118] DIA
ROUGH-IN
GUIDE

NOTE:
'T' TO BE
ON BOTTOM
AS SHOWN

3-1/4" [82]

Figure 2: Rough-in Dimensions – Shower only

DIM P902 P905 P909 P910

A

6

1

/

4

"

(165)

7"

(178)

7"

(178)

7"

(178)

Dimensions in inches [millimeters]

Advertising