Drawing 2 drawing 1 – RCBS ProMelt Electric Lead Furnace User Manual

Page 4

Advertising
background image

TO USE:

Set the thermostat at its lowest temperature and turn on the Pro-Melt. The pilot light located in the on-off switch
will indicate when there is power to the element.

After the Pro-Melt has been on for approximately 15 minutes (the pilot light will go on and off), set the thermostat
at 650

°

F.

Add small pieces of scrap lead or ingots to the melting pot, stacking them against the sides as much as possible.

Continue adding small pieces of lead or ingots until you have approximately 1" to 1

1

/

2

" of molten lead in the

melting pot. After you have 1" to 1

1

/

2

" of molten lead in the melting pot, more lead may be added in any amount.

Do not operate the Pro-Melt with less than 1" of alloy in it.

The flow of alloy can be increased or decreased by raising or lowering the socket head cap screw. Usually

1

/

32

" to

1

/

16

" of handle travel will give an adequate flow.

For bullet casting instructions, consult the instruction book you received with your bullet moulds.

When melting metals to produce an alloy, always be certain that you are using the recommended metals and
recommended amounts.

Drawing 2

Drawing 1

Advertising