3 assembly, 7 sectional drawing, 1 legend – Richter MNK Series User Manual

Page 8: Assembly, Legend, Series mnk, mnk-b, External flushing

Advertising
background image

Series MNK, MNK-B,

external flushing

Page 8

9230-060-en

Revision 02

TM 6778

Edition 05/2007

6.3 Assembly

Insert O-ring 412/2 using a feeler gauge (0.3 mm).
Screw on support 732 loosely at first.
Screw lock nut 920/07 onto transition pipe 721/1.
Screw transition pipe into the support until it is
centered.
Secure support finally. Tightening torque 10 Nm.

Screw in transition pipe until the plastic lining is
firmly positioned, i.e. can no longer be turned.
Then screw in the transition pipe further until its
flange bores are at 45° to the axis.
Secure transition pipe with lock nut. Tightening
torque 50 Nm.
Check with a gauge (approx. 2 mm Ø) whether
there is a free passage into the plain bearing ped-
estal.

Further assembly in accordance with the drawing in
Section 7.1.

7

Sectional drawing

7.1 Legend


339

plain bearing pedestal

412/2

o-ring

557/3

contact disc

720/1

elbow

721/1

transition pipe


732/x

support

901/8

hex. screw

914/2

hex. socket screw

920/x

hex. nut

934/3

lock washer

Pump size

X

1

X

2

Y

1

Y

2

Z

1

25-25-125

178

--

112

--

45

25-25-160

--

280

--

262

40

50-32-125

178

--

112

--

45

50-32-160

--

280

-

262

40

50-32-200

213

--

160

--

50

65-40-200

213

--

160

--

50

80-50-160

--

280

--

262

40

80-50-200

213

--

160

--

50

80-50-250

256

--

180

--

62

125-80-200

256

--

180

--

63

125-100-200

256

--

200

--

63

Dimensions in mm

Advertising
This manual is related to the following products: