Air line installation – Rite-Ride 4188 User Manual

Page 2

Advertising
background image

AIR LINE INSTALLATION

Figure “C”

Please take all necessary safety precautions

when installing your Coil-Rite kit.

NYLON

TIES

AIR LINE

AIR LINE

PUSH-TO-CONNECT

INFLATION VALVE

FLAT WASHER

HEX NUT

VALVE CAP

BODY OF

VEHICLE

Figure “D”

AIR LINE TO

INFLATION VALVE

Figure “B”

Secure with Nylon ties provided in your Coil-Rite kit.

STEP 6—INSTALL THE AIR LINE AND

INFLATION VALVE

Select a location on the vehicle for the air inflation valves. The

location can be located on the bumper or the body of the vehicle,

as long as it is in a protected location so the valve will not be

damaged, but maintain accessibility for the air chuck

see Figure

“C”

. Drill a 5/16” hole and install the air inflation valve using two

5/16” flat washers per valve as supports

see Figure “D”

.

FOLLOW STEPS 1–6

FOR THE OTHER AIR SPRING.

STEP 7—INFLATE AND TEST

Inflate the air springs to recommended operating pressure (see

Page 1 for operating pressures). With a soap and water solution,

check for air leaks around the fittings and valve core. We recom-

mend inflating and deflating in 5 p.s.i. increments to find the ideal

riding condition for your vehicle.

STEP 8—COMPLETION

This now completes the installation. Install the wheels and torque

the lug nuts to the manufacturers specifications. Raise the vehicle

and remove the jack stands and lower the vehicle back onto the

ground.

NOTE: CHECK AIR PRESSURE

ON A MONTHLY BASIS.

Advertising
This manual is related to the following products: