Upper bracket installation kit assembly, Lower bracket installation, Figure “a – Rite-Ride 2384 User Manual

Page 2: 2wd, non-z71, Tire

Advertising
background image

UPPER

BRACKET

FRAME

HOLES FROM

JOUNCE BUMPER

REMOVAL

AIR

SPRING

4X4 AND Z71 2WD

10MM X 30MM

FLAT HEAD

BOLT

FRAME

UPPER

BRACKET

AIR

SPRING

10MM X 30MM

FLAT HEAD

BOLT

2WD, NON-Z71

JOUNCE

BUMPER

SUPPORT

HOLES FROM

JOUNCE BUMPER

REMOVAL

UPPER BRACKET INSTALLATION

KIT ASSEMBLY

FIGURE “A”

LOWER

BRACKET

AIR

SPRING

3/8”-16 X 5/8”

FLAT HEAD

BOLT

ELBOW

FITTING

5/8”-18

HEX NUT

5/8” LOCK

WASHER

UPPER

BRACKET

AXLE

JOUNCE

STOP

LEAF STACK

FR

ONT

WHEEL

3/8”-16 X 2 1/2”

CARRIAGE BOLT

3/8”-16 FLANGE

LOCK NUT

AXLE

STRAP

AIR

SPRING

ASSEMBLY

TIRE

NOTE: UPPER & LOWER

BRACKET INSTALLATION

DIFFERS BETWEEN

2WD AND 4X4 & Z71.

PLEASE SEE INSTRUCTIONS.

LOWER BRACKET

INSTALLATION

Advertising