tekmar 265 Boiler Control User Manual

Data brochure, D 265, Boiler control 265

Advertising
background image

- Data Brochure

Boiler Control 265

D 265

07/10

1

of

36

©

2010 D

265

-

07/10

The tekmar Boiler Control 265 can control the supply water temperature on up to three modulating boilers based on outdoor
temperature or setpoint requirements. The control can be set to control up to two modulating boilers based on outdoor temperature
or domestic hot water requirements. A large easy to read display provides current system temperatures and operating status. The
control has outputs for a primary pump, individual boiler pumps, and either a combustion air damper or an alert.

Additional functions include:

• Outdoor

Reset

• Sequential or Parallel Modulation
• Installer and Advanced access levels
• Primary pump output
• Individual boiler pump outputs
• Pump

purging

• Boiler demand for space heating loads

• DHW demand for domestic hot water loads
• Setpoint demand for setpoint loads
• 0 – 10 V (dc) BAS / EMS input
• Test sequence to ensure proper component operation
• Setback input for energy savings
• CSA C US certified
• Pump

exercising

Input

Universal

Sensor

Included

Input

Universal

Sensor

Included

Input

Outdoor

Sensor

Included

or

Input

0-10 V (dc)

External Signal

Input

Boiler

Demand

Output

Modulating

Boiler

Output

Boiler

Enable

Output

Pump

Output

Boiler

Enable

or

Pump

Input

Setpoint

or DHW

Demand

Input

115 V (ac)

Power Supply

Output

Primary

Pump

Input

Timer or Switch

Optional

Output

Combustion Air

or Alert

1

Com

2

Boil
Sup

3

Boil
Ret

4

Out

+

5

UnO

Sw

6

+

7

+

+

8

Mod2 mA

Mod1 mA

9 10 11

12 13

Prim

P1

L

14

N

15 16 17

1

18

1

19

2

20

2

21 22 23 24 25 26 27 28 29

Boil

Dem

30

Com
Dem

31

Setp/
DHW

Boiler Control 265

Three Modulating Boiler & DHW / Setpoint

Do not apply power

Mod3 mA

Power

Boiler

Boiler

C.A./
Alert

Boiler 3 /

DHW

Boiler

Pump 1

Boiler

Pump 2

Boiler

Pump 3

H203

7B

Menu

Item

Boiler Demand
DHW / Setpoint Demand
WWSD

Modulation
Boiler Output (x10,000 BTU/hr)
External Input Signal

Offset / Priority Override

Test

off

not testing

red

testing

red

testing paused

For maximum heat,
press & hold Test for
3 seconds.

Meets Class B:
Canadian ICES
FCC Part 15

Dat

e Code

Made in Canada by

tekmar Control Systems Ltd.

Power

115 V ±10% 60 Hz 600 VA

Relays

230 V (ac) 5 A 1/3 hp, pilot duty 240 VA

Demands

20 to 260 V (ac) 2 VA

Stand Alone

Advanced

External Input

Off

CA.

Off

Alert

Fixed Lead

First On / Last Off

First On / First Off

Soft Stop

Rotate

Parallel

Installer

Exercise

Sequential

Output

Modulating

Boiler

Output

Modulating

Boiler

or

Signal wiring must be rated at least 300 V.

Note:
Boiler, DHW,
or setpoint
demand must
be powered with
20 to 260 V (ac)
before the boiler
is able to fire.

Advertising