tekmar 274 Boiler Control User Manual

Data brochure, 274_d, Boiler control 274

Advertising
background image

274_D

11/12

- Data Brochure

Boiler Control 274

1

of

44

©

2012 274_D

-

11/12

The Boiler Control 274 operates up to four on/off boilers to provide outdoor reset operation, domestic hot water and setpoint

operation with priority. When operating as a tN4 System Control, the 274 can connect with up to 24 tN4 devices on a single
boiler bus. The 274 has primary pump sequencing capabilities along with a flow proof or combustion air damper proof
demand.

tN4 Compatible
24 Hour, 5-1-1, 7 Day Schedule
Flow or Combustion Air Proof
Four On/Off Boilers
Equal Run Time Rotation





Primary Pump Sequencing
DHW Operation
Optional DHW Sensor
Setpoint Operation




Additional functions include:

Input

Universal

Sensor

Included

Input

Universal

Sensor

Included

tN4

Boiler

Bus

Input

Outdoor Sensor

Included

OR

0-10 or 2-10 V (dc)

from EMS

Output
Up to 4

On/Off Boilers

Input

115 V (ac)

Power Supply

Input
Flow OR
C.A. Proof

Output

Up to 2

Boiler Pumps

Output

DHW Pump

OR

Primary Pump

Output

Combustion

Air Damper

OR Alert

OR

OR

Output

Primary

Pump

Input
DHW OR

Setpoint

Demand

Signal

Input
Boiler

Demand

Signal

Primary

DHW

1

13

24

VIEW

Demands

Setback

Boiler Control 274

One tN4, Four Stage Boiler & DHW / Setpoint

Menu

Item

Test

Boiler Demand
DHW / Setpoint Demand
Proof Demand

EMS Input Signal

Priority Override

Power

115 V ±10% 60 Hz 7 VA, 1150 VA max.

Relays

230 V (ac) 5 A 1/3 hp

Demands 20 to 260 V (ac) 2 VA

Made in Canada by

tekmar Control Systems Ltd

tektra 1020-02

Meets Class B:

Canadian ICES

FCC Part 15

For maximum heat,

press and hold Test

button for 3 seconds.

not testing

testing

testing paused

off

red

red

Off

EMS

Rotate

Fixed Last

Pump Sequencer

Exercise

Off

Dat

e Code

H2050A

Signal wiring must be rated at least 300 V.

DHW

23

/Setp

Com

24

Dem

Pr.

25

Dem

2

5

1

3

+

4

6

BRet/

Com

tN4

Boil

Out

Com

Prim

P1

L

N

20

Power

22

21

8

7

Do not apply power

18

DHW

/ P2

17

19

10

9

12

11

14

13

16

15

Fixed Lead

First On / Last Off

First On / First Off

Relay

1

Relay

2

Relay

3

Relay

4

C.A. /

Alert

Boiler

Demand

Sup

DHW

Zone Load Shedding

1 Up to 4 On/Off Boilers

2 Up to 2 On/Off Boilers & 2 Pumps

3 Up to 2 Lo/Hi Boilers

4 1 Lo/Hi Boiler & 1 Pump

5 1 Three Stage Boiler & Pump

6 1 Four Stage Boiler

Modes

Advertising