Room Temperature Units (RTU) and Indoor Sensors

RTUs and / or Indoor Sensors provide indoor temperature feedback to the control.

DIP Switch set to Zone 1 Heating

• If zone 4 is used, connect an RTU 054 or Indoor Sensor 076 to the

Com Sen —

RTU 4 (8 and 10) terminals on the control.

• If zone 3 is used, connect an RTU 054 or Indoor Sensor 076 to the

Com Sen —

RTU 3 (8 and 9) terminals on the control.

• If zone 2 is used, connect an RTU 054 or Indoor Sensor 076 to the

Com Sen —

RTU 2 (5 and 7) terminals on the control.

• If the zone 1 is used for heating, an RTU 054 or Indoor Sensor 076 must be

connected to the

Com Sen — RTU 1 (5 and 6) terminals on the control.

DIP Switch set to Zone 1 Cooling

• If the zone

1 relay is used to enable an external cooling control system, an RTU or

Indoor Sensor is not required for this zone.

• If the zone

1 relay is used to control a cooling unit, an RTU 054 or Indoor Sensor

076 must be connected to the

Com Sen — RTU 1 (5 and 6) terminals on the control.

STEP FIVE

TESTING THE WIRING

Each terminal block must be unplugged from its header on the control before power
is applied for testing. Pull straight down to unplug the terminal block.

The following tests are to be performed using standard testing practices and procedures and
should only be carried out by properly trained and experienced persons.

A good quality electrical test meter, capable of reading from at least 0 — 200 V (ac) and at
least 0 — 2,000,000 Ohms, is essential to properly test the wiring and sensors.

Test the Sensors

−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−

−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−

−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−

−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−

−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−

In order to test the sensors and Room Temperature Units (RTUs), the actual temperature
at each sensor and RTU location must be measured. A good quality digital thermometer
with a surface temperature probe is recommended for ease of use and accuracy of testing.
Where a digital thermometer is not available, a spare sensor can be strapped alongside
the one to be tested and the readings compared. Test the sensors and RTU(s) according
to the instructions in the Data Brochures D 070 and D 054.

Test the Power Supply











Make sure exposed wires or bare terminals are not in contact with other wires or grounded
surfaces. Turn on the power and measure the voltage between the

Power N — L (2 and 3)

terminals using an AC voltmeter, the reading should be between 110 and 130 V (ac).

Test the Powered Inputs











If a DHW Demand is used, measure the voltage between terminals

DHW Dem — DHW Dem (22 and 23). When the DHW Demand

device (aquastat etc.) calls for heat, you should measure between 22 and 130 V (ac) at the terminals. When the DHW Demand device
is off, you should measure less than 5 V (ac).

Test the Outputs











System Pump

If a system pump is connected to the

Sys Pmp (1) terminal, make sure power to the terminal block is off and install a jumper between

the terminals

Sys Pmp — Power L (1 and 3). When power is applied to the terminals Power N — L (2 and 3), the system pump should

start. If the pump does not turn on, check the wiring between the terminal block and the pump and refer to any installation or
troubleshooting information supplied with the pump. If the pump operates properly, disconnect the power and remove the jumper.

Variable Speed Injection Pump

If a variable speed injection pump is connected to the terminal

Var. Pmp (4), make sure power to the terminal block is off and install

a jumper between the terminals

Power L — Var . Pmp (3 and 4). When power is applied to terminals Power N — L (2 and 3), the

variable speed injection pump should operate at full speed. If the pump does not operate, check the wiring between the terminal
block and the pump and refer to any installation or troubleshooting information supplied with the pump. If the pump operates properly,
disconnect the power and remove the jumper.

Com

Sen

UnO

Sw

RTU

2

8

RTU

3

5 6

7

RTU

4

RTU

1

Com

Sen

9 10

12

Zo

In

11

13

Com

Sen

Sup

Sen

Com

Sen

14

16

Out

Sen

15

17

Boil

Sen

Com

Sen

UnO

Sw

5 6

RTU

1

12

Zo

In

11

13

Com

Sen

Sup

Sen

Com

Sen

14

16

Out

Sen

15

17

Boil

Sen

RTU

2

7

RTU

3

9

RTU

4

10

8

Com

Sen

Com

Sen

UnO

Sw

5 6

RTU

4

RTU

1

10

12

Zo

In

11

13

Com

Sen

Sup

Sen

Com

Sen

14

16

Out

Sen

15

17

Boil

Sen

RTU

2

7

8

RTU

3

Com

Sen

9

Com

Sen

UnO

Sw

8

RTU

3

5

6

RTU

4

RTU

1

Com

Sen

9 10

12

Zo

In

11

13

Com

Sen

Sup

Sen

Com

Sen

14

16

Out

Sen

15

17

Boil

Sen

RTU

2

7

11 12 13

15

14

16 17

Boil

Sen

Zo
In

Out

Sen

Com
Sen

UnO

Sw

Com
Sen

Sup

Sen

Installation

Advertising