3 start-up, Start-up, 3start-up – Trebor PC7 User Manual

Page 6

Advertising
background image

3

START-UP

• Controller air supply pressure must be regulated to a maximum of 80 psig.
• Open the fluid suction (IN) line valve, if necessary.
• Open the fluid discharge (OUT) line valve, if necessary.
• Adjust the speed control screw fully Clockwise (CW) until fully retracted.

Warning! Do not apply too much torque to screw or damage may result.

MTD0629

SPEED CONTROL SCREW

SPEED CONTROL SCREW

• Open air supply line to operate pump. Operate pump at 20 psig initially to

prime pump.

CAUTION: When handling potentially dangerous fluids under pressure,

the pump and its fittings should be placed in an enclosure away from operators.

PAGE 6

PC7 CONTROLLER OPERATION / MAINTENANCE MANUAL

Advertising