Pak 200i – Tweco PAK 200i User Manual
Page 37
Advertising
PAK 200i
Manual 0-5335
INSTALLATION
3-13
d. After 10 seconds place the ON/OFF switch to ON again.
e. Repeat steps ‘b’ through ‘d’ until the system no longer shuts down. Depending on the length of the torch
leads this sequence may need to be done three to five times.
f. After the system stays operational allow the pump to operate for ten minutes to properly purge any air
from the coolant lines before using the system.
4. Re�fill the reservoir and re�install the filler cap.
NOTE
Circuitry in the power supply will generate a ‘Low coolant’ message if the coolant level is too low.
Advertising