INSTALLATION PROCEDURES

Small Strain

Relief

Black Wire

of Pilot Lead

Ground Terminal

Nut

Star Washer

Pilot Terminal

Red Wire

of Pilot Lead

A-01495

Figure 3-12 Pilot Lead Connection at Power Supply

d. Secure the shield lead (black) to the ground

connection with the nut and star washer re-
moved above.

e. Remove the nut and star washer from the other

pilot connection inside the power supply.

f. Secure the pilot lead (red) to the pilot connec-

tion with the nut and star washer removed
above.

9. Connect the other end of the Power Lead to the

Master Power Supply per the following proce-
dure:

a. Feed the Power Lead through the large strain

relief at the front panel of the Master Power
Supply.

b. Remove the nut from the power connection

terminal inside the power supply.

Large

Strain Relief

Power Lead

Nut

Power Lead

Terminal Bolt

A-01496

Figure 3-13 Power Lead Connection at Master

Power Supply

c. Secure the power lead to the connection with

the nut removed above.

3.07 Dual Power Supply -

Connecting To Slave Unit

For systems that are using the dual power supplies, Mas-
ter and Slave, additional connections must be made in-
side the Arc Starter Box.

1. Remove the cover from the Arc Starter Box.

2. Feed the Slave Power Supply pilot lead through

the boot at the end of the Arc Starter Box.

3. Connect the pilot lead to the pilot connection per

the following procedure:

a. Remove the nut and external star washer from

the pilot connection bolt.

b. Place the ring lug on the pilot wire over the

end of the bolt.

c. Re-install the external star washer and nut to

secure the lead.

Star

Washer

Nut

Pilot Lead

Connection

Slave Pilot Lead

A-01976

Figure 3-14 Pilot Lead Connection - Slave

4. Feed the Slave Power Supply power lead through

the boot at the end of the Arc Starter Box.