INSTALLATION

THERMAL ARC 95 S

Installation 3-3

Manual 0-5086

Input Power
Each unit incorporates an INRUSH circuit. When the MAIN CIRCUIT SWITCH is turned on, the inrush circuit provides

pre-charging for the input capacitors. A relay in the Power Control Assembly (PCA) will turn on after the input capacitors

have charged to operating voltage (after approximately 5 seconds)

NOTE

Damage to the PCA could occur if 133 VAC or higher is applied to the Primary Power Cable.

Table 3-2: Primary Circuit Sizes to Achieve Maximum Current

Model

Primary Supply Lead Size

(Factory Fitted)

Minimum Primary

Current Circuit Size

(Vin/Amps)

Current & Duty Cycle

TIG

STICK

Thermal Arc 95 S

12 AWG (3.3mm²)

115V/30A

-

90A / 23.6V @ 20%

115V/21A

95A / 13.8V @ 20%

-