Assembly, Mounting the spider, Wheatheart & brandt / any four-rod cage models – Wheatheart Hydrostatic Portable and Truck-Mount Super Sweep User Manual

Page 13: Sakundiak / any center rod cage models

Advertising
background image

W

HEATHEART

- H

YDROSTATIC

B

IN

S

WEEP

3. A

SSEMBLY

S

TANDARD

, P

ORTABLE

, T

RUCK

M

OUNT

, & S

UPER

S

WEEP

3.1. M

OUNTING

T

HE

S

PIDER

IM1 R3

13

3. Assembly

3.1. MOUNTING THE SPIDER

3.1.1. W

HEATHEART

& B

RANDT

/ A

NY

F

OUR

-R

OD

C

AGE

M

ODELS

1. Tack weld pivot hole spider on top as illustrated in Figure 3.1. Although the

drawings do not show the safety mesh, only the mesh rods at the pivot hole

should be removed, leaving the remainder of the cage intact.

Important:

Pivot spider is only tack welded for proper positioning.

2. Once it is tack welded, swing the motor mount the full 360°. Make sure it

does not catch on the guard cage or the transport hitch, and ensure the pivot

hole plate is near level with the ground when the auger is in the working

position.

3. Weld securely. Refer to Figure 3.1.

Figure 3.1 Mounting Spider on Four Rod Cages

Note:

The end of the auger bearing to the center of the pivot hole should measure
approximately 9”.

3.1.2. S

AKUNDIAK

/ A

NY

C

ENTER

R

OD

C

AGE

M

ODELS

1. Remove legs from spider. Although the drawings do not show the safety

mesh, only the mesh rods at the pivot hole should be removed, leaving the

remainder of the cage intact.

Warning:

Before continuing, please reread the safety information relevant to this section at the

beginning of this manual. Failure to follow the safety instructions can result in serious injury,

death, or property damage.

Advertising